An Allied Steel Building is the modern building solution for indoor or covered riding arenas. Many of our equestrian experts are choosing steel construction for riding arenas because of their strength and efficiency. Allied’s steel structures feature clear span framing, allowing for the column free interior with high ceilings that riding arenas require. An Allied Steel Building is designed according to your use, which means your structure will accommodate the activities that your space needs including dressage, jumping & more.
Building Kit Gallery
WHAT’S INCLUDED?
EVERY PREFABRICATED KIT INCLUDEDS THE FOLLOWING
- Commercial solid red iron I-beam frames
- All necessary roof purlins and wall girts
- Complete trim package
- All necessary hardware, nuts & bolts
- Heavy Industrial Rod Bracing
- Base closures for weather tightness
- 3 sets of stamped engineered drawings
- Pre-welded clips for easy erection, all pre-cut
- Allied’s Sun Guard paneling
- Carbon steel Fasteners with a lifetime warranty
- Dedicated project manager
- 25-50 year panel warranty included dependent on color selection
- Extended warranty available
- Weather Lock roof system, 80k psi including
- 23 regional shipping distribution points
IS YOUR BUILDING UNDER 2,200 SF?
For buildings under 2,200 sqft. DIY, drag, drop, and get instant pricing!
HOW DOES IT WORK?
TAKE A LOOK AT OUR EASY PROCESS BELOW
DON’T TAKE OUR WORD FOR IT?
SEE WHAT OUR CLIENT’S HAVE TO DAY
Things to Consider
Price Your Building
What People Are Saying
A BIOCOM, é um projetos privados mais reconhecidos de Angola. tinhamos a demanda de dois galpões para armazenamento de produtos. A Allied apresentou uma solução de engenharia que vai nos reduzir o custo de armazenamento, ao tempo em que temos dois galpões com a mais moderna Engenharia.
“We needed steel and siding for an indoor horse arena at 7000ft with a 90 pound snow load. After researching other companies Allied Steel Buildings had the materials that best fit our needs. They were very helpful and great to work with. I highly recommend them.”
La construcción de su estructura fue muy rápida. El montaje llevó 2 semanas, 2 semanas más para paredes y techo y otra semana adicional para echar las placas de los pisos. Actualmente estamos haciendo todos los interiores de las oficinas, el cableado, etc. En 4-5 semanas estará todo finalizado. La verdad es que todo el proceso ha sido muy eficiente.
Just purchased our seventh building. ln the process of ordering a 50k sqft business condominium project for Northern Alberta from Allied, which speaks volumes. Keep up the great work Allied!
Puedo decir sobre mi experiencia que ha sido un buen aprendizaje haber trabajado con Allied Steel Buildings. Me encanta su eficacia a la hora de responder nuestras dudas y los cumplimientos de los tiempos de entrega. Muchas gracias por su cooperación y disposición para con mi empresa. Tienen un equipo de trabajo excelente. Ya estamos planificando dos nuevos proyectos para este año y gracias a Dios no tengo que buscar otro proveedor!